County maintenance crews will continue crack sealing CSAH 2 in Daggett Brook Township and CSAH 30 in Wolford Township throughout the week. Crews will begin crack sealing CR 124 and CSAH 33 later in the week.
Contracted crack sealing crews will continue/begin crack sealing CSAH 9, CR 121 and CSAH 45 in Daggett Brook and St. Mathis Townships throughout the week.
Maintenance crews will be working in the drive lane and on the shoulders simultaneously, creating the need to close one or more lanes of traffic. Signing, flaggers or portable traffic lights will control the traffic flow through these work areas.
County maintenance crews will be patching potholes on various county roads throughout the week. Crews will be pulling over and stopping frequently on the shoulders of the roads, to perform the patching work. Loose patching material debris may be present.
Motor graders will level and shape gravel roads throughout the County early in the week. Motorists should watch for the slow moving graders and tractors when traveling on gravel county and FAD roads.
Seasonal road load limit weight restrictions are in effect until Tuesday, May 14. All roads are posted and will be enforced. Most roads will have restrictions removed Tuesday, May 14, 2019, except for CR 105, CR 106, CR 141, SAD roads and CSAH 36, east of Hwy 6 due to sub-soil saturation and frost boils.
All maintenance work is weather sensitive and is subject to delay or change.
For further Information on the county highway system, or to report a roadway issue, please contact the Highway Department at (218) 824-1110 or visit our Crow Wing County website at http://www.crowwing.us.
-End-