County work crews
will perform hot mix patching on CSAH 1 Monday between Little Pine Road and the
Aitkin County Line, in Little Pine Township.
County work crews
will perform spray patching on CR 148 and CR 144 in Oak Lawn and Long Lake Townships throughout the week.
Simultaneously
County work crews will perform spray patching on CR 113 between CSAH 2 and CSAH
51 in Platte Lake Township throughout the week.
Maintenance work
crews will be working on one travel lane and shoulder simultaneously, creating
the need to close one lane of traffic. Signing, flaggers or portable traffic
lights will control the traffic flow through these work areas.
Maintenance crews will patch potholes on various county roads later in the week. Crews will be pulling over and stopping frequently on the shoulders of the roads, to perform the patching work. Loose patching material debris may be present.
Ditch mowing will continue
throughout the week on various county roads.
Motor graders will
be smoothing gravel county roads Wednesday and Thursday.
All maintenance
work is weather sensitive and is subject to delay or change.
For further Information on the county highway system, or to report a roadway issue, please contact the Highway Department at (218) 824-1110 or visit our Crow Wing County website at http://www.crowwing.us.